Location: Washington DC, United States
Principal: Bing Thom, Michael Heeney
Project Director: James Brown
Project Team: Brian Ackerman , John Camfield, Venelin Kokalev, Ling Meng, Michael Motlagh, Francis Yan, Harald Merk, Berit Wooge, Bibianka Fehr, Dan Du, Nicole Hu, Robert Sandilands, Bonnie Thom , Amirali Javidan, Shinobu Homma, Derek Kaplan, Marcos Hui, Rose Chung
Acoustical Engineer: Talaske
Theater Consultant: Fisher Dachs Associates
Structural Engineer: Fast & Epp
Electrical Engineers: Stantec, in association with Vanderweil Engineers
Mechanical Engineers: Yoneda & Associates
Mechanical Design/Build: Southland Industries
Code Consultant: LMDG in association with Koffel Associates
Glazing Consultant: RA Heintges & Associates
Lighting Design: William Lam
Civil Engineers: Wiles Mensch Corporation
General Contractor: Clark Construction
Construction Manager: KCM, Paeonian
Client: Arena Stage
Project Area: 200,000 sqf
Project Year: 2010
Photographs: Nic Lehoux, Courtesy of Bing Thom Architects
A new theater, subsurface administration, parking and support spaces, rehearsal halls and a free span roof with bars and a cafe enclosed by a one of a kind wood/glass cable supported curtain-wall system. Arena Stage has a free form roof and a 140′ cantilever. Over 15,000 cubic yards of architectural concrete was used, and a complex audio, theater, acoustic and MEP systems.
from archdaily
'REF. > Architecture' 카테고리의 다른 글
[ Murphy Jahn ] University of Chicago – South Campus Chiller Plant (1) | 2010.11.23 |
---|---|
[ Norihiko Dan ] Hsiangshan Visitor Center (0) | 2010.11.22 |
*협소주택 [ Haworth Tompkins ] Dovecote Studio (1) | 2010.11.19 |
[ Ron Arad ] New Design Museum_Israel (0) | 2010.11.18 |
[ OODA + OOIIO ] Taiwan Conceptual Tower (0) | 2010.11.16 |