Location: Chicago, USA
Design team: John Ronan, Josh Bergman, Evan Menk, Marcin Szef, Anna Ninoyu
Project area: 45,000 sq. ft.
Project year: 2009 – 2010
Photographs: Steve Hall, Hedrich Blessing Photography
The new charter high school building is meant to form a campus with the existing Youth Center, yet retain its own identity. Similar materials are employed to bind the two structures into one unified campus, including corrugated stainless steel siding, and aluminum composite panels. A large glazed lobby space in the new school allows views of the Youth Center from both levels; a stone walkway provides access for students walking between the two buildings.
Inside the new school, skylights running the length of the building bring natural light into the school corridors on both levels. Glass walls between the hallway and classrooms allow this light to further penetrate into the building; classroomswillreceivenaturallightfromtwodirections. Thiscorridorglazingalsoallowsstudentsandvisitors visual access into the classrooms, and reinforces the school’s philosophy that students should always be alert and engaged.ç
To the north of the building, a decorative fence encircles a secured parking area. The fencing incorporates signage that identifies the neighborhood and together with plantings and porous paving, creates a sustainable gateway park.
from arhchdaily
'REF. > Architecture' 카테고리의 다른 글
[ Stein Halvorsen Sivilarkitekter ] Tromsø Firestation (0) | 2010.12.23 |
---|---|
[ AOKIJUN ] SIA AOYAMA BUILDING (0) | 2010.12.22 |
[ Oppenheim Architecture + Design ] Enea Headquarters (0) | 2010.12.20 |
[ RUFproject ] Football Training Centre Soweto (0) | 2010.12.19 |
[ Asymptote Architecture and Artech Architects ] Kaohsiung Port Terminal (0) | 2010.12.17 |