Location:Stockholm, Sweden
Collaborators: Frida Öster and Jonatan Blomgren
Geology Consultant: Geosigma AB
Construction: Albert France-Lanord Architects
Client: Bahnhof AB
Construction Area: 1,200 sqm
Project year: 2008
Photographs: Åke E:son Lindman
The choice of lightning has been very challenging. We tried to bring as much variation as possible. Otherwise it is very easy to loose the feeling of time in an enclosed space.
Our references come straight from science fiction films, mostly ‘Silent Running’ and a bunch of Bond films with Ken Adams set design.
One can describe the process in five different phases:
-planning
-destruction of the former office and blowing up the rock to create extra space.
-reinforce the cave. concrete work.
-technical installations. electrical.
-glass and steel work. paint and furnishing.
The client had a strong vision from the first brief and the result is only possible because of their persistence, the absence of compromise and great communication/ understanding between all parts under the process.
It has been very exciting to work with a space which at first didn’t offer one square angle: the rock. The main room is not a traditional space limited by surfaces but defined by the emptiness inside a mass.
'REF. > Interior' 카테고리의 다른 글
[ 4of7 ] Wellness Sky (0) | 2008.11.28 |
---|---|
[ franklinazzi ] CLUB 12 ON THE BUND SHANGHAI CHINE (0) | 2008.11.26 |
[ FRANKLINAZZI ] CENTRE DE LA FRANCOPHONIE DES AMERIQUES | QUEBEC (0) | 2008.11.24 |
[ Plystudio ] J-Loft (0) | 2008.11.20 |
[ franklinazzi ] LILLE 3000_GARE SAINT SAUVEUR (0) | 2008.11.20 |